Hi all.
Wondered if anyone has come across this issue.
Using Contributor/TM1 Applications (what is the definitive term these days?) User irrespective of security rights selects a nodal department and enters a Websheet. Updates a value on the Websheet and clicks on an action button which passes parameters and runs a process which in turns runs 3 processes. (1 of which runs a further 11 processes).
The processes runs successfully as per the logs but it doesnt do what it is meant to and refreshes the websheet with inconsistent data.
The same websheet can be run directly from perspectives and works absolutely fine.
Its a complex set of processes which spreads data into one cube. Uses the spreaded data and progresses that data over 12 different periods using historic progression rates and then splits the data into another cube to show a different view based on where departments interact with each other
APAR PI78234 - 10.2.2 FP6 Processes not running correctly on Contributor
-
- Community Contributor
- Posts: 110
- Joined: Thu Aug 26, 2010 7:41 am
- OLAP Product: TM1, PA
- Version: PAL 2.0.8
- Excel Version: 2016
- Location: North West England
APAR PI78234 - 10.2.2 FP6 Processes not running correctly on Contributor
Last edited by MSidat on Wed Mar 15, 2017 2:18 pm, edited 1 time in total.
Always Open to Opportunities
-
- Community Contributor
- Posts: 110
- Joined: Thu Aug 26, 2010 7:41 am
- OLAP Product: TM1, PA
- Version: PAL 2.0.8
- Excel Version: 2016
- Location: North West England
Re: APAR PI78234 10.2.2 FP6 Processes not running correctly on Contributor
As an update on this. IBM have identified this as a bug and are looking into it. Sent over our data directory this morning. First time officially dealing with IBM on a bug so not sure how long the process would take.
It appears that the first process works fine, but from the second process onwards it just does not do anything with the data, it still creates the correct views for zero'oing out data and creating the views for the datasources etc but no further data changes are made in the sandbox. All works fine if websheet and action button is executed via perspectives.
I do have multiple zero outs on that 2nd TI Process and wondering if its something to do with that. I do recall seeing a post on here a while back from someone saying they discovered a limitation with the number of zero outs in one process. Cant seem to find it now, would appreciate if anyone remembers this and point me in the right direction.
UPDATE: Got an APAR for it, and got IBM to test it on a FP5 installation and it works fine so been advised to downgrade to FP5.
Thanks
It appears that the first process works fine, but from the second process onwards it just does not do anything with the data, it still creates the correct views for zero'oing out data and creating the views for the datasources etc but no further data changes are made in the sandbox. All works fine if websheet and action button is executed via perspectives.
I do have multiple zero outs on that 2nd TI Process and wondering if its something to do with that. I do recall seeing a post on here a while back from someone saying they discovered a limitation with the number of zero outs in one process. Cant seem to find it now, would appreciate if anyone remembers this and point me in the right direction.
UPDATE: Got an APAR for it, and got IBM to test it on a FP5 installation and it works fine so been advised to downgrade to FP5.
Thanks
Always Open to Opportunities