Dear all,
how to calculate the interest rate in tm1? if we use excel, the formula is (=rate(nper,pmt,pv)..
but when i try use this formula in tm1, it cannot..
i have 2 dimensions,(dim a and dim b)
dim a have 4 elements, such as
-present value
-periode
-pmt (use paymt formula)
-rate
and dim b just for write the value..
for the example, i input present value 150.000.000, periode 60, and input the rate 5% manually not using the formula,
and i got the PMT 2.830.685
but how to calculate the rate, if we now the PV, periode and PMT?
what the formula's we use?
please help me..
thanks
Admin Note: Moved to the correct forum. This does not belong in General.
how to calculate interest rate
-
- Site Admin
- Posts: 6667
- Joined: Sun May 11, 2008 2:30 am
- OLAP Product: TM1
- Version: PA2.0.9.18 Classic NO PAW!
- Excel Version: 2013 and Office 365
- Location: Sydney, Australia
- Contact:
Re: how to calculate interest rate
You've asked that question in three separate threads now. Once is enough.tm1learn wrote: how to calculate the interest rate in tm1? if we use excel, the formula is (=rate(nper,pmt,pv)..
but when i try use this formula in tm1, it cannot..
i have 2 dimensions,(dim a and dim b)
dim a have 4 elements, such as
-present value
-periode
-pmt (use paymt formula)
-rate
and dim b just for write the value..
for the example, i input present value 150.000.000, periode 60, and input the rate 5% manually not using the formula,
and i got the PMT 2.830.685
but how to calculate the rate, if we now the PV, periode and PMT?
what the formula's we use?
please help me..
thanks
Admin Note: Moved to the correct forum. This does not belong in General.
Also, please refer to the Request For Assistance Guidelines, which ask you to at least do a search of the documentation and the forum before posting a question.
Had you done a search for this, you may well have encountered this thread on that very subject.
"To them, equipment failure is terrifying. To me, it’s 'Tuesday.' "
-----------
Before posting, please check the documentation, the FAQ, the Search function and FOR THE LOVE OF GLUB the Request Guidelines.
-----------
Before posting, please check the documentation, the FAQ, the Search function and FOR THE LOVE OF GLUB the Request Guidelines.
-
- Posts: 8
- Joined: Wed Jul 16, 2014 1:38 am
- OLAP Product: Tm1
- Version: 10.2
- Excel Version: excel 2010
Re: how to calculate interest rate
i'm so sorry for the post
by the way, how to solve this ?
by the way, how to solve this ?
-
- Site Admin
- Posts: 6667
- Joined: Sun May 11, 2008 2:30 am
- OLAP Product: TM1
- Version: PA2.0.9.18 Classic NO PAW!
- Excel Version: 2013 and Office 365
- Location: Sydney, Australia
- Contact:
Re: how to calculate interest rate
Go to the thread that I provided you with a link to in the previous post. On the last line the words "this thread" are a hyperlink. The method of solving it is contained there.tm1learn wrote:i'm so sorry for the post
by the way, how to solve this ?
"To them, equipment failure is terrifying. To me, it’s 'Tuesday.' "
-----------
Before posting, please check the documentation, the FAQ, the Search function and FOR THE LOVE OF GLUB the Request Guidelines.
-----------
Before posting, please check the documentation, the FAQ, the Search function and FOR THE LOVE OF GLUB the Request Guidelines.