Hey guys,
I've got a weird problem that I don't quite understand.
When doing a dynamic slice on a view into excel I get my list of dimensions first (About 40 dimensions) with the data following after that. If I cut the section with all my dimensions and move it say from column B to column C the formula's change with it and hitting F9 still works.
Now, when I cut the cells referring to the dimensions and paste it in a new sheet the formula's still change with it (For example "A1" might become "Sheet2!A1"), but I get KEY_ERR's.
Any idea why this happens ?
This is the first time I've actually got a cube with this many dimensions (Normally it's less than 20). Could this have something to do with it ?
DBR() error when pointing to a different sheet
- TheMichael
- Posts: 12
- Joined: Tue Aug 19, 2008 12:08 pm
- Location: Johannesburg, South Africa
-
- MVP
- Posts: 3703
- Joined: Fri Mar 13, 2009 11:14 am
- OLAP Product: TableManager1
- Version: PA 2.0.x
- Excel Version: Office 365
- Location: Switzerland
Re: DBR() error when pointing to a different sheet
The problem is more likely to be that you have done a dynamic slice rather than a static slice. I have always avoided dynamic slices like the plague but I am pretty sure that they require the row, column and title headings to all be on the same sheet as the data/view range.