Hi
Is there a way I can skip the ViewZeroOut option in a TI that I generate in PM from a Link?
Same question for incremental load instead of replacing data.
I mean except for going to the Advanced tab and comment out / amend the code manually. Because the code is regenerated every time you change the Manual mapping in the link and click on Generate Process so the manual edit in the TI code is not a real option for me now.
I found how to do it in a TI process in PM but not if the TI is generated from a Link.
CX 10.2 FP1
Thanks