Cognos Express CPU Sizing

Post Reply
User avatar
jameswebber
Community Contributor
Posts: 188
Joined: Sun Nov 21, 2010 8:00 pm
OLAP Product: Cognos Express 10
Version: CE 10.1.1
Excel Version: 2010
Location: Wellington, New Zealand
Contact:

Cognos Express CPU Sizing

Post by jameswebber »

Guys,
I wanted to pick your brains about CPU sizing of your cognos express instances.

We have purchased the Reporter, Advisor & Xcelerator Products so according to this link (page 18):
http://ndb.bg/ndb/home-new.nsf/0/2dec95 ... xpress.pdf
(and this link http://ebookbrowse.com/cognos-express-9 ... d107036637)
The server requirements are:
Minimum CPU* and RAM: 4 cores / 4GB per installed product**
Recommended CPU* and RAM: 8 cores / 8GB per installed product*

I.e. minimum 12 cores and 12 GB recommending a whopping 24 cores 24 GB RAM (ouch) :shock: .
Our cores are much better that the 2GHz Intel Pentiums and surely no mid-size client can come up with 24 cores?
In fact our infrastructure team tell me the technology to provide a virtualised 24 core box is very new. Currently we have Vmware vSphere standard ESXi 4.1 installed on dual socket quad core xeon Intel SR2600UR server platform connected to Netapp FAS2050 SAN over an iSCSI dedicated network.

Anyone got any experience with performance?
Will a dual socket quad core suffice?

Just wondering what other TM1 peeps are running there CE installations on?
User avatar
jim wood
Site Admin
Posts: 3961
Joined: Wed May 14, 2008 1:51 pm
OLAP Product: TM1
Version: PA 2.0.7
Excel Version: Office 365
Location: 37 East 18th Street New York
Contact:

Re: Cognos Express CPU Sizing

Post by jim wood »

I asses the number of cores based on the number of users you expect to hit concurrently. If your only going to have 5 users total a quad core would be more than enough. As for memory, the TM1 element will want most of that. Again that depends on the size of the model. If you know you are going to build something pretty big then I would look to have a little bit too much rather than to little.

If you are installing on 64-bit I would say 8GB is a minimum requirement. (As 64-bit applications use roughly twice the memory)

I hope that helps,

Jim.
Struggling through the quagmire of life to reach the other side of who knows where.
Go Build a PC
Jimbo PC Builds on YouTube
OS: Mac OS 11 PA Version: 2.0.7
User avatar
qml
MVP
Posts: 1098
Joined: Mon Feb 01, 2010 1:01 pm
OLAP Product: TM1 / Planning Analytics
Version: 2.0.9 and all previous
Excel Version: 2007 - 2016
Location: London, UK, Europe

Re: Cognos Express CPU Sizing

Post by qml »

jim wood wrote:64-bit applications use roughly twice the memory
Not to challenge your whole assertion, but generally it tends to be closer to a 20-40% difference caused purely by the switch from a 32-bit to a 64-bit architecture (not all machine code needs to double in size, just the addressing bits). Of course software generally gets bigger and its memory usage larger for a number of reasons, two of them being cheaper hardware and lazy software developers. :mrgreen:
Kamil Arendt
User avatar
jim wood
Site Admin
Posts: 3961
Joined: Wed May 14, 2008 1:51 pm
OLAP Product: TM1
Version: PA 2.0.7
Excel Version: Office 365
Location: 37 East 18th Street New York
Contact:

Re: Cognos Express CPU Sizing

Post by jim wood »

That's why I put roughly.
Struggling through the quagmire of life to reach the other side of who knows where.
Go Build a PC
Jimbo PC Builds on YouTube
OS: Mac OS 11 PA Version: 2.0.7
User avatar
jameswebber
Community Contributor
Posts: 188
Joined: Sun Nov 21, 2010 8:00 pm
OLAP Product: Cognos Express 10
Version: CE 10.1.1
Excel Version: 2010
Location: Wellington, New Zealand
Contact:

Re: Cognos Express CPU Sizing

Post by jameswebber »

Thanks guys for the very prompt reply. :)

IBM advice I got back yesterday was 1 core dedicated to each connector, with 4 GB of ram per connector.
I.e. 3 connectors thats 3 cores and 12GB of ram with a caveat it is dependant on the workload for each connector, and the age and performance of the processors etc.

I think we will give it 4 dual cores (maximum a node on our virtual blade can handle) and 24GB since our current TM1 itself is running on 16GB.
Looks like with 9.5.2 we would make use of more cores with parallelisation
tomok
MVP
Posts: 2836
Joined: Tue Feb 16, 2010 2:39 pm
OLAP Product: TM1, Palo
Version: Beginning of time thru 10.2
Excel Version: 2003-2007-2010-2013
Location: Atlanta, GA
Contact:

Re: Cognos Express CPU Sizing

Post by tomok »

qml wrote: Not to challenge your whole assertion, but generally it tends to be closer to a 20-40% difference caused purely by the switch from a 32-bit to a 64-bit architecture (not all machine code needs to double in size, just the addressing bits).
I've done quite a few conversions for clients moving from 32-bit to 64-bit and I've never had one that came in at less than around 75% more memory needed in the 64-bit world.
Tom O'Kelley - Manager Finance Systems
American Tower
http://www.onlinecourtreservations.com/
User avatar
jim wood
Site Admin
Posts: 3961
Joined: Wed May 14, 2008 1:51 pm
OLAP Product: TM1
Version: PA 2.0.7
Excel Version: Office 365
Location: 37 East 18th Street New York
Contact:

Re: Cognos Express CPU Sizing

Post by jim wood »

Me to. I think QML was coming theoretical point of view. But as I always say in theory bumble bees shouldn't be able to fly.
Struggling through the quagmire of life to reach the other side of who knows where.
Go Build a PC
Jimbo PC Builds on YouTube
OS: Mac OS 11 PA Version: 2.0.7
User avatar
stephen waters
MVP
Posts: 324
Joined: Mon Jun 30, 2008 12:59 pm
OLAP Product: TM1
Version: 10_2_2
Excel Version: Excel 2010

Re: Cognos Express CPU Sizing

Post by stephen waters »

jameswebber wrote: Looks like with 9.5.2 we would make use of more cores with parallelisation
Note that Cognos Express currently uses TM1 9.5.1 so you won't get the benefits of Parallel interaction yet, or probably for some time.

This also cause a problem for CX customers who want to move (or plan to move ) to Excel 2010 which is not suported by TM1 9.5.1
User avatar
jameswebber
Community Contributor
Posts: 188
Joined: Sun Nov 21, 2010 8:00 pm
OLAP Product: Cognos Express 10
Version: CE 10.1.1
Excel Version: 2010
Location: Wellington, New Zealand
Contact:

Re: Cognos Express CPU Sizing

Post by jameswebber »

Yeah our infrastructure team was laughing at me for asking for 24 cores for an application that doesn't support office 2010.

Lack of 2010 support and no release date is a huge IBM failing IMHO.
Although I hear first half of 2012 is a possibility.
Post Reply